Home
Maps
History
Guided Tour
Features
Pictures
Books
The Society
Magazine
Events
RESTORATION
Support us
Contact
Links

Members login

 

RESTORATION

<<Previous   

First 1 2 3 Last

July - 2016

Waterway Recovery Group arrives

Preparing the Intake site for reconstruction

July 2016

Building a dam

Diverting the stream to give a dry work site.

July 2016

Preparing to rebuild a wall

Loose stones must be removed and re-mortared before the rebuilding can take place

July 2016

Marking out

Sheets of heavy plywood being marked out to make formwork to support the culvert arch during repairs

July 2016

The Culvert repaired

The culvert has been restored to its original length

<<Previous   

Return to home page

Return to top of this page